Real Jobs. Real Results.

See how we’ve helped Madison homeowners solve complex tree problems safely, efficiently, and on budget. Every case study below is a real job — real trees, real challenges, real outcomes.

Case Study 01 · Middleton, WI

80-Year Oak Overhanging Roof & Power Lines

The problem: A massive white oak had grown to within 4 feet of the homeowner’s roof and was dropping limbs on power lines. Three other companies declined the job due to the proximity to the utility lines and the tight access between the house and fence. The homeowner had been living under a hazardous situation for two years.

Our solution: We coordinated with We Energies for a temporary line drop, used crane-assisted rigging to remove large scaffold limbs without any contact with the roof, and completed the full removal in a single day. The stump was ground immediately after. The site was fully cleaned before we left.

1 Day
Job Completed

Zero
Property Damage

⭐ 5/5
Customer Rating

“Three other companies said they wouldn’t touch it. Madison Tree Services Co. not only took the job — they made it look easy. They were careful, professional, and left our yard cleaner than when they arrived.”

— Tom & Carol B. · Middleton

Case Study 02 · Sun Prairie, WI

Storm Emergency: Maple Across Driveway & Fence

The problem: A late-night derecho uprooted a 60-ft silver maple and dropped it across the homeowner’s driveway, crushing a section of fence and trapping a vehicle inside the garage. The call came in at 11 PM.

Our solution: Emergency crew on-site within 2 hours. We systematically cut and removed the tree from the driveway first so the vehicle could be freed, then cleared the fence line and removed all debris. The homeowner had full access restored by 3 AM.

<2 Hrs
Response Time

11 PM
Called Us

By 3 AM
Fully Cleared

“The storm left a massive maple across my driveway and fence at 11 PM. They picked up the phone, arrived by 1 AM, and had it cleared by 3. I’ve never seen anything like it. Absolute lifesavers.”

— Renee J. · Sun Prairie

Case Study 03 · Fitchburg, WI

Full Property Land Clearing for New Home Build

The problem: A 1.2-acre wooded lot needed to be cleared for a new home construction. The site included mature trees, dense brush, and several large stumps from a previous partial clearing. The builder needed the site ready within a tight 3-day window before grading equipment arrived.

Our solution: Phased clearing over 3 days — selective tree removal to preserve the perimeter trees per the builder’s plan, full stump grinding across the clearing footprint, brush chipping on-site, and full log haul-away. We finished a half-day ahead of schedule.

3 Days
Full Clearing

1.2 Acres
Site Cleared

On Time
Builder’s Schedule

“We needed the lot cleared on a tight timeline for our builder. Madison Tree Services Co. came out, gave us a fair quote the same day, and finished ahead of schedule. Our builder was impressed. We’ll be calling them again for the landscaping phase.”

— Derek & Amy S. · Fitchburg

Your Property Could Be Our Next Success Story

Get a free estimate and see what we can do for you. Same-day response, no obligation.